Matches in climatepub4-kg for { <http://example.org/resource/5dd402d3-88c1-4332-ad3d-93bbe153797f> ?p ?o ?g. }
Showing items 1 to 9 of
9
with 100 items per page.
- 5dd402d3-88c1-4332-ad3d-93bbe153797f definition "The turbines are assembled at the Bonus factory in Jutland. First the lower part of the tower was produced and then transported to the B&W dock on large trucks. The size of the tube was so big that a special route had to be used to get around the motorway bridges, which are too low for the tubes to pass under. Summary provided by http://www.middelgrunden.dk/MG_UK/ukindex.htm" @default.
- 5dd402d3-88c1-4332-ad3d-93bbe153797f id "1650665" @default.
- 5dd402d3-88c1-4332-ad3d-93bbe153797f path_id 1bb6821d-8534-40ce-a6ee-7c88ce4d3c9f @default.
- 5dd402d3-88c1-4332-ad3d-93bbe153797f path_id a158f804-b000-4013-9513-cee7790381c3 @default.
- 5dd402d3-88c1-4332-ad3d-93bbe153797f path_label "COMMERCIAL" @default.
- 5dd402d3-88c1-4332-ad3d-93bbe153797f path_label "Providers" @default.
- 5dd402d3-88c1-4332-ad3d-93bbe153797f prefLabel "DK/MWTC" @default.
- 5dd402d3-88c1-4332-ad3d-93bbe153797f reference "" @default.
- 5dd402d3-88c1-4332-ad3d-93bbe153797f tag "Providers" @default.