- W2003025784 abstract "Abstract During 1978 a large 4.2 million barrels (0.7 million cubic meters) per day water injection pressure maintenance project in the Ghawar Field in pressure maintenance project in the Ghawar Field in Saudi Arabia was successfully converted from the use of subsurface saline water to the use of treated seawater for injection. New facility design and construction involved equipment selection and installation in a magnitude never before encountered in seawater treatment operations. The known processes of seawater treatment including processes of seawater treatment including filtration, deaeration, and scale stabilization were implemented in this case with improved concepts of high volume filtration, different approaches of inert stripping gas generation, and self-sufficiency for almost all chemical treatment. The planning, manning, organization, and start-up planning, manning, organization, and start-up management to bring this new facility on-stream within constraints of time, budget, and water quality are discussed. The ability to smoothly convert water supplies without loss of injection volumes or prolonged shutdowns evolved from early problem analysis sessions which anticipated problem analysis sessions which anticipated problems, identified causes, and took preventive problems, identified causes, and took preventive action to remove obstruction in advance. Pilot plant operation during construction finalized plant operation during construction finalized filter media design, pinpointed chemicals, trained operators, and served as a focal point on location to build spirit of teamwork among groups related to Operations, Maintenance, Engineering, and Project Management. Test operation of full scale facilities was undertaken at the earliest moment with support and concurrence of the Construction agency to confirm design and installation. Late delivery of critical control panels required extensive field engineering and equipment modification to hold to start-up schedule. Results show that early indepth participation by the ultimate operating proponent and support groups insures knowledge, proponent and support groups insures knowledge, understanding, and competency in operating facilities critical to support of large volume oil withdrawals. Background Oil withdrawals from the North 'Uthmaniyah portion of the Ghawar Field require pressure portion of the Ghawar Field require pressure maintenance by water injection. Peripheral injection along both flanks of this large oilfield was begun in 1966 using gravity injection wells. In 1973, a program was initiated to convert gravity injection wells to power injection. New surface facilities were designed and constructed incorporating a central saline aquifer water gathering station called 'Uthmaniyah Water Supply Station (UWSS) boosting aquifer water to any of five water injection station identified as 'Uthmaniyah Water Injection Pump Stations (UWIPS). Twelve Combustion Gas Turbines (CGT) were used as prime movers in these stations direct driving booster and shipper pumps to provide high pressure water along flanks of oilfield for peripheral injection below the oil-water contact. Figure I shows area of interest and original power injection arrangement. The decision to replace aquifer water was made in 1974 when it became apparent that the design goal of 4.2 million barrels (0.7 million cubic meters) per calendar day could not be supplied from saline aquifer water supply in this area. Treated seawater was selected as the replacement supply. This paper presents a case history of the organization, planning, manning, and start-up management to bring this new facility on-stream. FACILITY DEVELOPMENT The treated seawater system is shown schematically in Figure 2 taken from a previous publications. Completely new facilities were required publications. Completely new facilities were required from the Qurayyah offshore intake and treating plant to the suction side of UWSS. Until 1974 plant to the suction side of UWSS. Until 1974 the Qurayyah site existed as unimproved, sandy beach without habitation, reasonable access, or other improvements. A new 45 Km paved highway was built from Abqaiq headquarters to the selected Qurayyah plant site. Site preparation commenced in January, 1976." @default.
- W2003025784 created "2016-06-24" @default.
- W2003025784 creator A5031558724 @default.
- W2003025784 creator A5079267257 @default.
- W2003025784 date "1979-09-23" @default.
- W2003025784 modified "2023-09-27" @default.
- W2003025784 title "A Case Study Of Start-Up Management For A Large Seawater Injection Project" @default.
- W2003025784 doi "https://doi.org/10.2118/8409-ms" @default.
- W2003025784 hasPublicationYear "1979" @default.
- W2003025784 type Work @default.
- W2003025784 sameAs 2003025784 @default.
- W2003025784 citedByCount "2" @default.
- W2003025784 countsByYear W20030257842018 @default.
- W2003025784 crossrefType "proceedings-article" @default.
- W2003025784 hasAuthorship W2003025784A5031558724 @default.
- W2003025784 hasAuthorship W2003025784A5079267257 @default.
- W2003025784 hasConcept C111368507 @default.
- W2003025784 hasConcept C127313418 @default.
- W2003025784 hasConcept C144133560 @default.
- W2003025784 hasConcept C197248824 @default.
- W2003025784 hasConcept C39432304 @default.
- W2003025784 hasConceptScore W2003025784C111368507 @default.
- W2003025784 hasConceptScore W2003025784C127313418 @default.
- W2003025784 hasConceptScore W2003025784C144133560 @default.
- W2003025784 hasConceptScore W2003025784C197248824 @default.
- W2003025784 hasConceptScore W2003025784C39432304 @default.
- W2003025784 hasLocation W20030257841 @default.
- W2003025784 hasOpenAccess W2003025784 @default.
- W2003025784 hasPrimaryLocation W20030257841 @default.
- W2003025784 hasRelatedWork W1486856999 @default.
- W2003025784 hasRelatedWork W1517220085 @default.
- W2003025784 hasRelatedWork W1596575362 @default.
- W2003025784 hasRelatedWork W168690063 @default.
- W2003025784 hasRelatedWork W192389206 @default.
- W2003025784 hasRelatedWork W2010869060 @default.
- W2003025784 hasRelatedWork W2129993654 @default.
- W2003025784 hasRelatedWork W2255065233 @default.
- W2003025784 hasRelatedWork W2261223673 @default.
- W2003025784 hasRelatedWork W2263578136 @default.
- W2003025784 hasRelatedWork W2288870585 @default.
- W2003025784 hasRelatedWork W2319399024 @default.
- W2003025784 hasRelatedWork W2470232797 @default.
- W2003025784 hasRelatedWork W2737167539 @default.
- W2003025784 hasRelatedWork W2915256840 @default.
- W2003025784 hasRelatedWork W3117803681 @default.
- W2003025784 hasRelatedWork W324892248 @default.
- W2003025784 hasRelatedWork W869787026 @default.
- W2003025784 hasRelatedWork W881987549 @default.
- W2003025784 hasRelatedWork W96730032 @default.
- W2003025784 isParatext "false" @default.
- W2003025784 isRetracted "false" @default.
- W2003025784 magId "2003025784" @default.
- W2003025784 workType "article" @default.