Matches in SemOpenAlex for { <https://semopenalex.org/work/W2063174705> ?p ?o ?g. }
Showing items 1 to 54 of
54
with 100 items per page.
- W2063174705 abstract "Summary For most early oil-production facilities, higher oil production is expected in the initial days of field life because of the high reservoir pressure. In this specific case study, oil production has reached the floating production, storage, and offloading (FPSO) unit topside-design limit of 100,000 BOPD (662 m3/h) with only five wells connected. Most of these wells were choked to between 30 and 50% to limit the oil production within the installed nameplate capacity of the FPSO unit. Therefore, to take advantage of the low gas/oil ratio (GOR) and the high dry-oil production during early field life, the client has requested this study be undertaken to identify the maximum oil production without compromising process safety and while avoiding major modifications. The main bottlenecks to increasing crude-oil production to greater than the design capacity are identified as - Increased temperature resulting in nonstabilized crude: On the basis of the oil composition, stabilization of the crude before leaving the topside is an issue. With an increase in production and the limitation on utility system, there is not enough heat available to flash off light components and/or cool down the crude before it enters the cargo tank to prevent any further flashing. These flashed-off gases will be vented through the cargo-vent system, along with displaced gases (which are significantly higher than flash gases). The cargo-vent system is designed for vent load during cargo-terminal loading, and, therefore, crude-flash rates will not be anywhere near the design capacity of the vent system. - Limitations of utility systems: As expected, all utility systems are designed for 100,000-BLPD (662 m3/h) liquid production, and any increase in production will impact the utility balance. To accommodate for additional flow, either modifications are required to the existing system (e.g., additional duty, exchanger modifications) or optimization of the existing system is required. - Separator Capacity: As long as water cut is negligible and a small quantity of water can be allowed to settle in the cargo tank, current crude-oil production has the potential to be increased with the separator operating as a two-phase separator. A potential crude-oil production rate of 120,000 BOPD (795 m3/h) can be achieved immediately, without any modifications, if slightly-higher-temperature crude oil is allowed, along with some additional hydrocarbon venting of the gases, from the cargo vent to the atmosphere. Changes in process parameters (pressure and temperature) will allow optimization of the utilities and will allow the crude-storage specifications to be met without any physical modifications. The actual field trial did match with the study results, and production was increased to greater than the design capacity without many process-stability issues. Therefore, this type of study provides a quick but thorough method of investigating the way forward to improve production without compromising safety limits, allowing the operator to take full advantage of favorable reservoir performance to optimize the field economics." @default.
- W2063174705 created "2016-06-24" @default.
- W2063174705 creator A5000200113 @default.
- W2063174705 date "2014-04-29" @default.
- W2063174705 modified "2023-09-28" @default.
- W2063174705 title "Debottlenecking Existing Offshore Production Facilities To Safely Extend Their Operation Capacities" @default.
- W2063174705 doi "https://doi.org/10.2118/169905-pa" @default.
- W2063174705 hasPublicationYear "2014" @default.
- W2063174705 type Work @default.
- W2063174705 sameAs 2063174705 @default.
- W2063174705 citedByCount "0" @default.
- W2063174705 crossrefType "journal-article" @default.
- W2063174705 hasAuthorship W2063174705A5000200113 @default.
- W2063174705 hasConcept C107053488 @default.
- W2063174705 hasConcept C127413603 @default.
- W2063174705 hasConcept C139719470 @default.
- W2063174705 hasConcept C162284963 @default.
- W2063174705 hasConcept C162324750 @default.
- W2063174705 hasConcept C187320778 @default.
- W2063174705 hasConcept C199104240 @default.
- W2063174705 hasConcept C2778348673 @default.
- W2063174705 hasConcept C77595967 @default.
- W2063174705 hasConcept C78762247 @default.
- W2063174705 hasConceptScore W2063174705C107053488 @default.
- W2063174705 hasConceptScore W2063174705C127413603 @default.
- W2063174705 hasConceptScore W2063174705C139719470 @default.
- W2063174705 hasConceptScore W2063174705C162284963 @default.
- W2063174705 hasConceptScore W2063174705C162324750 @default.
- W2063174705 hasConceptScore W2063174705C187320778 @default.
- W2063174705 hasConceptScore W2063174705C199104240 @default.
- W2063174705 hasConceptScore W2063174705C2778348673 @default.
- W2063174705 hasConceptScore W2063174705C77595967 @default.
- W2063174705 hasConceptScore W2063174705C78762247 @default.
- W2063174705 hasLocation W20631747051 @default.
- W2063174705 hasOpenAccess W2063174705 @default.
- W2063174705 hasPrimaryLocation W20631747051 @default.
- W2063174705 hasRelatedWork W167318646 @default.
- W2063174705 hasRelatedWork W1958920538 @default.
- W2063174705 hasRelatedWork W1976746649 @default.
- W2063174705 hasRelatedWork W1980744266 @default.
- W2063174705 hasRelatedWork W1988174245 @default.
- W2063174705 hasRelatedWork W2018087767 @default.
- W2063174705 hasRelatedWork W2067842135 @default.
- W2063174705 hasRelatedWork W2118812191 @default.
- W2063174705 hasRelatedWork W2354334694 @default.
- W2063174705 hasRelatedWork W2388144764 @default.
- W2063174705 hasRelatedWork W2550120722 @default.
- W2063174705 hasRelatedWork W2785195437 @default.
- W2063174705 hasRelatedWork W322644006 @default.
- W2063174705 hasRelatedWork W2462803131 @default.
- W2063174705 isParatext "false" @default.
- W2063174705 isRetracted "false" @default.
- W2063174705 magId "2063174705" @default.
- W2063174705 workType "article" @default.