- W2892044844 abstract "Abstract Site layout plan is required for the management of the construction site and operations. A well-developed site layout has positive impact on workers, working environment, productivity and eventual success of a project. Moreover, the proposed construction methods for a project have the most significant impact on productivity, quality and cost of construction projects. This paper proposes a site layout model through BIM and construction methodology integration. An illustrative case study method was adopted for the study, where the assumptions and processes adopted in the site layout model were expounded and illustrative example was presented. The study substantiated the need to incorporate construction methods for projects in the BIM-based modelling of construction site layout plan; and the need to reinforce the possibility of re-thinking the processes of planning, construction, and management of projects. Resumen Es preciso planificar la implantación y ejecución de la construcción para una adecuada gestión de la construcción. La implantación y distribución de los espacios de acopios y servicios tiene un impacto positivo en los trabajadores, en el ambiente de trabajo, en la productividad y en el éxito del Proyecto. Tener en cuenta en la planificación de la construcción los métodos y soluciones constructivas definidos en el Proyecto de Ejecución tienen un gran impacto en la productividad, calidad y coste del Proyecto. En este estudio se propone utilizar las herramientas BIM integrando metodología de construcción para desarrollar la planificación de la implantación y ejecución de la construcción. Para ello se utiliza un caso de estudio ilustrativo en el que se exponen los supuestos y los procesos adoptados. El estudio confirma la necesidad de tener en cuenta e incorporar los métodos y soluciones constructivas en el modelo BIM de la implantación de la construcción para estudiar con antelación la planificación, la ejecución y la gestión del proyecto." @default.
- W2892044844 created "2018-09-27" @default.
- W2892044844 creator A5048122543 @default.
- W2892044844 creator A5085690301 @default.
- W2892044844 date "2018-09-10" @default.
- W2892044844 modified "2023-09-27" @default.
- W2892044844 title "Construction site layout optimization and 3D visualization through BIM tools = Visualización 3D y optimización a través de herramientas BIM aplicado a los planos de proyecto" @default.
- W2892044844 cites W177863154 @default.
- W2892044844 cites W1963656945 @default.
- W2892044844 cites W1967947504 @default.
- W2892044844 cites W1985755061 @default.
- W2892044844 cites W1993417500 @default.
- W2892044844 cites W2011535451 @default.
- W2892044844 cites W2011828403 @default.
- W2892044844 cites W2016984519 @default.
- W2892044844 cites W2019229090 @default.
- W2892044844 cites W2044479004 @default.
- W2892044844 cites W2051163040 @default.
- W2892044844 cites W2059036395 @default.
- W2892044844 cites W2070006186 @default.
- W2892044844 cites W2075280491 @default.
- W2892044844 cites W2075324012 @default.
- W2892044844 cites W2119872325 @default.
- W2892044844 cites W2127967045 @default.
- W2892044844 cites W2131334143 @default.
- W2892044844 cites W2143429929 @default.
- W2892044844 cites W2146309129 @default.
- W2892044844 cites W2165847463 @default.
- W2892044844 doi "https://doi.org/10.20868/bma.2018.2.3770" @default.
- W2892044844 hasPublicationYear "2018" @default.
- W2892044844 type Work @default.
- W2892044844 sameAs 2892044844 @default.
- W2892044844 citedByCount "1" @default.
- W2892044844 countsByYear W28920448442023 @default.
- W2892044844 crossrefType "journal-article" @default.
- W2892044844 hasAuthorship W2892044844A5048122543 @default.
- W2892044844 hasAuthorship W2892044844A5085690301 @default.
- W2892044844 hasBestOaLocation W28920448441 @default.
- W2892044844 hasConcept C139719470 @default.
- W2892044844 hasConcept C142362112 @default.
- W2892044844 hasConcept C15708023 @default.
- W2892044844 hasConcept C162324750 @default.
- W2892044844 hasConcept C166957645 @default.
- W2892044844 hasConcept C204983608 @default.
- W2892044844 hasConcept C205649164 @default.
- W2892044844 hasConcept C2776505523 @default.
- W2892044844 hasConcept C41008148 @default.
- W2892044844 hasConceptScore W2892044844C139719470 @default.
- W2892044844 hasConceptScore W2892044844C142362112 @default.
- W2892044844 hasConceptScore W2892044844C15708023 @default.
- W2892044844 hasConceptScore W2892044844C162324750 @default.
- W2892044844 hasConceptScore W2892044844C166957645 @default.
- W2892044844 hasConceptScore W2892044844C204983608 @default.
- W2892044844 hasConceptScore W2892044844C205649164 @default.
- W2892044844 hasConceptScore W2892044844C2776505523 @default.
- W2892044844 hasConceptScore W2892044844C41008148 @default.
- W2892044844 hasIssue "2" @default.
- W2892044844 hasLocation W28920448441 @default.
- W2892044844 hasOpenAccess W2892044844 @default.
- W2892044844 hasPrimaryLocation W28920448441 @default.
- W2892044844 hasRelatedWork W1551874966 @default.
- W2892044844 hasRelatedWork W2033484148 @default.
- W2892044844 hasRelatedWork W2257100347 @default.
- W2892044844 hasRelatedWork W2334181482 @default.
- W2892044844 hasRelatedWork W2358668433 @default.
- W2892044844 hasRelatedWork W2376932109 @default.
- W2892044844 hasRelatedWork W2390279801 @default.
- W2892044844 hasRelatedWork W2621824143 @default.
- W2892044844 hasRelatedWork W2748952813 @default.
- W2892044844 hasRelatedWork W2899084033 @default.
- W2892044844 hasVolume "2" @default.
- W2892044844 isParatext "false" @default.
- W2892044844 isRetracted "false" @default.
- W2892044844 magId "2892044844" @default.
- W2892044844 workType "article" @default.