Matches in SemOpenAlex for { <https://semopenalex.org/work/W2896916807> ?p ?o ?g. }
Showing items 1 to 37 of
37
with 100 items per page.
- W2896916807 abstract "Cost and time analysis are most important on the contruction project. Optimal Time and minimal cost become standart to make profit benchmarks on a project. Therefore, it is necessary to optimize the cost and time by looking for work items that are included in the critical path. The purpose of this study is to know the change of cost and time due to the addition of working time, change of cost and time due to the addition of employee, as well as cost that needed if the projects experienced delays and penalty.. So it will be compared from all three to get the minimum cost with the optimum duration.The data used in this study is secondary data obtained from contractor implementing. Data analysis using time cost trade off method with microsoft project 2010 program. The results of the study, From the time cost trade off with the addition of 1 hours of work per day conducted on first day on critical jobs during the project, obtained the reduction in the cost of Rp 39,552,394,71 and the reduction in the duration of 36.18 days. Addition of 2 hours of work per day obtained the reduction in the cost of Rp 57,532,834.66 and and the reduction in the duration of 62.61 days. Addition of 3 hours of work per day obtained the reduction in the cost of Rp 69,392,147,01 and and the reduction in the duration of 82.48 days. Meanwhile, for the addition of employee for 1 hours obtained the reduction in the cost of Rp 52.497.085,35 and the reduction in the duration of 36.18 days. Addition of employee for 2 hours obtained the reduction in the cost of Rp 91,349,394.80 and the reduction in the duration of 62.61 days. Addition of employee for 3 hours obtained the reduction in the cost of Rp 120,645,301,55 and the reduction in the duration of 82,48 days. So that, the optimal time and cost occur when addition employee is incurred for 3 hours, compared to overtime and overdue. Namely with the optimal cost of the project of Rp 2,418,408,305.45 and the optimal duration of the project for 57.52 days." @default.
- W2896916807 created "2018-10-26" @default.
- W2896916807 creator A5008328090 @default.
- W2896916807 creator A5032168698 @default.
- W2896916807 date "2018-01-01" @default.
- W2896916807 modified "2023-10-17" @default.
- W2896916807 title "Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi Pembangunan Gedung Olah Raga (Gor)" @default.
- W2896916807 doi "https://doi.org/10.18196/st.211213" @default.
- W2896916807 hasPublicationYear "2018" @default.
- W2896916807 type Work @default.
- W2896916807 sameAs 2896916807 @default.
- W2896916807 citedByCount "1" @default.
- W2896916807 countsByYear W28969168072020 @default.
- W2896916807 crossrefType "journal-article" @default.
- W2896916807 hasAuthorship W2896916807A5008328090 @default.
- W2896916807 hasAuthorship W2896916807A5032168698 @default.
- W2896916807 hasBestOaLocation W28969168071 @default.
- W2896916807 hasConcept C41008148 @default.
- W2896916807 hasConceptScore W2896916807C41008148 @default.
- W2896916807 hasLocation W28969168071 @default.
- W2896916807 hasLocation W28969168072 @default.
- W2896916807 hasOpenAccess W2896916807 @default.
- W2896916807 hasPrimaryLocation W28969168071 @default.
- W2896916807 hasRelatedWork W2130043461 @default.
- W2896916807 hasRelatedWork W2350741829 @default.
- W2896916807 hasRelatedWork W2358668433 @default.
- W2896916807 hasRelatedWork W2376932109 @default.
- W2896916807 hasRelatedWork W2382290278 @default.
- W2896916807 hasRelatedWork W2390279801 @default.
- W2896916807 hasRelatedWork W2748952813 @default.
- W2896916807 hasRelatedWork W2899084033 @default.
- W2896916807 hasRelatedWork W3004735627 @default.
- W2896916807 hasRelatedWork W2530322880 @default.
- W2896916807 isParatext "false" @default.
- W2896916807 isRetracted "false" @default.
- W2896916807 magId "2896916807" @default.
- W2896916807 workType "article" @default.