Matches in SemOpenAlex for { <https://semopenalex.org/work/W3168992449> ?p ?o ?g. }
Showing items 1 to 81 of
81
with 100 items per page.
- W3168992449 endingPage "40" @default.
- W3168992449 startingPage "1" @default.
- W3168992449 abstract "A holistic national approach is required to handle the growing issue of construction and demolition (C&D) waste in Australia. Through this project, the discrepancies and inconsistencies related to C&D waste management regulations in each jurisdiction were identified, and recommendations for harmonising reforms were made accordingly. The specific objectives were:1. Review regulations and their application in practice in different jurisdictions governing C&D waste management, identifying discrepancies and making recommendations for reforms.2. Develop a consistent approach to define and measure C&D waste across different jurisdictions.3. Identify economic factors that govern the disposal and reduce/reuse/recycling of C&D waste.4. Conduct a feasibility study on creating a marketplace to connect organisations and industries across jurisdictions for trading waste.5. Identify opportunities to integrate supply chains and develop an integrated supply chain lifecycle model espousing a cradle-to-cradle approach.Comprehensive analysis of literature, regulations, policies and best management practice guidelines are the basis for results presented here. Notably, desktop research focused on the regulatory framework in eight jurisdictions of Australia was conducted to understand their similarities and inconsistencies. According to this review, several recommendations were made that areboth national and state-specific. Furthermore, economic barriers and enablers towards the establishment of a domestic C&D waste market were explored, and a set of recommendations were proposed accordingly. Subsequently, a comprehensive review was performed to know the Australian and worldwide experience in the establishment and performance of the C&D waste market. Furthermore, an economic evaluation was conducted based on the mathematical modelling of various C&D waste management techniques (landfilling vs. recycling). In this evaluation, the economic performance of these waste management methods was analysed and compared, while keeping associated costs in mind. Next, a case study approach was adopted to analyse and identify opportunities for reducing C&D waste throughout the supply chain of five typical construction materials — brick,concrete, glass, timber and steel. For each case study, a conceptual model, called LowMor (Low of Waste More of Resources) was developed to picture the application of cradle to cradle approach to C&D waste management in the light of circular economy principles. Lastly, a survey was conducted to capture the perception of main stakeholders of C&D waste management on the relevant issues and reforms. The survey captured the responses from 132 participants who were based across Australia.Participants were active in the construction industry, waste management and recovery industry, waste collectors, designers and the construction material manufacturing industry at the time of the survey. An important finding from the study was to seriously consider the development of a domestic marketplace for trading C&D waste in Australia. Overall, the project findings contribute to Australia’s understanding of effective management of C&D waste by providing a clear picture of C&D waste state of play andhow it can improve. The findings can be further analysed and used by policymakers and whoever has an interest in C&D waste to better plan for innovative and efficient C&D waste management resulting in the further diversion from landfilling." @default.
- W3168992449 created "2021-06-22" @default.
- W3168992449 creator A5001043296 @default.
- W3168992449 creator A5027983195 @default.
- W3168992449 creator A5028757194 @default.
- W3168992449 creator A5050515367 @default.
- W3168992449 creator A5051521984 @default.
- W3168992449 creator A5067561030 @default.
- W3168992449 creator A5075265286 @default.
- W3168992449 date "2020-01-01" @default.
- W3168992449 modified "2023-09-24" @default.
- W3168992449 title "Construction and Demolition Waste Management in Australia Final Industry Report, Project 1.65" @default.
- W3168992449 hasPublicationYear "2020" @default.
- W3168992449 type Work @default.
- W3168992449 sameAs 3168992449 @default.
- W3168992449 citedByCount "0" @default.
- W3168992449 crossrefType "journal-article" @default.
- W3168992449 hasAuthorship W3168992449A5001043296 @default.
- W3168992449 hasAuthorship W3168992449A5027983195 @default.
- W3168992449 hasAuthorship W3168992449A5028757194 @default.
- W3168992449 hasAuthorship W3168992449A5050515367 @default.
- W3168992449 hasAuthorship W3168992449A5051521984 @default.
- W3168992449 hasAuthorship W3168992449A5067561030 @default.
- W3168992449 hasAuthorship W3168992449A5075265286 @default.
- W3168992449 hasConcept C108713360 @default.
- W3168992449 hasConcept C127413603 @default.
- W3168992449 hasConcept C144133560 @default.
- W3168992449 hasConcept C147176958 @default.
- W3168992449 hasConcept C162853370 @default.
- W3168992449 hasConcept C17744445 @default.
- W3168992449 hasConcept C199539241 @default.
- W3168992449 hasConcept C206588197 @default.
- W3168992449 hasConcept C2776949292 @default.
- W3168992449 hasConcept C2778076428 @default.
- W3168992449 hasConcept C2781469121 @default.
- W3168992449 hasConcept C39432304 @default.
- W3168992449 hasConcept C548081761 @default.
- W3168992449 hasConcept C91375879 @default.
- W3168992449 hasConceptScore W3168992449C108713360 @default.
- W3168992449 hasConceptScore W3168992449C127413603 @default.
- W3168992449 hasConceptScore W3168992449C144133560 @default.
- W3168992449 hasConceptScore W3168992449C147176958 @default.
- W3168992449 hasConceptScore W3168992449C162853370 @default.
- W3168992449 hasConceptScore W3168992449C17744445 @default.
- W3168992449 hasConceptScore W3168992449C199539241 @default.
- W3168992449 hasConceptScore W3168992449C206588197 @default.
- W3168992449 hasConceptScore W3168992449C2776949292 @default.
- W3168992449 hasConceptScore W3168992449C2778076428 @default.
- W3168992449 hasConceptScore W3168992449C2781469121 @default.
- W3168992449 hasConceptScore W3168992449C39432304 @default.
- W3168992449 hasConceptScore W3168992449C548081761 @default.
- W3168992449 hasConceptScore W3168992449C91375879 @default.
- W3168992449 hasLocation W31689924491 @default.
- W3168992449 hasOpenAccess W3168992449 @default.
- W3168992449 hasPrimaryLocation W31689924491 @default.
- W3168992449 hasRelatedWork W101214380 @default.
- W3168992449 hasRelatedWork W2182955903 @default.
- W3168992449 hasRelatedWork W2565479066 @default.
- W3168992449 hasRelatedWork W2586392947 @default.
- W3168992449 hasRelatedWork W2762729631 @default.
- W3168992449 hasRelatedWork W2786895081 @default.
- W3168992449 hasRelatedWork W2791528755 @default.
- W3168992449 hasRelatedWork W2956004408 @default.
- W3168992449 hasRelatedWork W3005270606 @default.
- W3168992449 hasRelatedWork W3031695898 @default.
- W3168992449 hasRelatedWork W3099157485 @default.
- W3168992449 hasRelatedWork W3106638477 @default.
- W3168992449 hasRelatedWork W3120475350 @default.
- W3168992449 hasRelatedWork W3148525426 @default.
- W3168992449 hasRelatedWork W3160191380 @default.
- W3168992449 hasRelatedWork W3209906426 @default.
- W3168992449 hasRelatedWork W749026613 @default.
- W3168992449 hasRelatedWork W785598106 @default.
- W3168992449 hasRelatedWork W2184771706 @default.
- W3168992449 hasRelatedWork W3016309206 @default.
- W3168992449 isParatext "false" @default.
- W3168992449 isRetracted "false" @default.
- W3168992449 magId "3168992449" @default.
- W3168992449 workType "article" @default.