Matches in SemOpenAlex for { <https://semopenalex.org/work/W4230709743> ?p ?o ?g. }
Showing items 1 to 52 of
52
with 100 items per page.
- W4230709743 abstract "High Capacity Artificial Lift Alternatives In The Offshore Environment William B. Cline; William B. Cline Gaffney, Cline and Associates Search for other works by this author on: This Site Google Scholar David W. Garford David W. Garford Gaffney, Cline and Associates Search for other works by this author on: This Site Google Scholar Paper presented at the SPE European Petroleum Conference, London, United Kingdom, October 1978. Paper Number: SPE-8070-MS https://doi.org/10.2118/8070-MS Published: October 24 1978 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Cline, William B., and David W. Garford. High Capacity Artificial Lift Alternatives In The Offshore Environment. Paper presented at the SPE European Petroleum Conference, London, United Kingdom, October 1978. doi: https://doi.org/10.2118/8070-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Europec featured at EAGE Conference and Exhibition Search Advanced Search AbstractThis paper assesses some of the artificial lift needs of the offshore industry and endeavours to highlight those areas which are independently critical to functional simplicity, reliability, safety and economics. The importance of planning for artificial lift requirements at the onset of development can be shown to be vital to optimum field economic performance.IntroductionIn spite of improved early field application of pressure maintenance/secondary recovery techniques it is likely that a great many high capacity offshore fields will ultimately be obliged to rely heavily upon artificial lift to maintain their required production schedules and economic performance standards. As the industry moves out into deeper waters not only does proper predevelopment long-term artificial lift planning become more important but, with the increasing surveillance of the industry by Government and other regulatory bodies, continually higher standards of safety and reliability must be met. Not only must flow be maintained on fields entering their oil production decline phase but the benefits of enhanced productivity and production maintenance at productivity and production maintenance at relatively high levels from natural flow well systems during the crucial early debt retirement years invariably play a critical role in terms of project economics particularly where marginal reserve accumulations are concerned. There is clearly the necessity to integrate artificial lift into the very early stages of field planning, both in terms of surface and sub-surface equipment. Initial plans for well completion and platform design (bearing in mind the severe cost of load bearing deck space) must allow for anticipated future lift requirements. This is especially in the context of the inevitable prospect of handling water production at a time in the economic life of the project when significant incremental capital cost supplements are, at best, problematic.PLANNING REQUIREMENTS PLANNING REQUIREMENTS While pre-development planning for artificial lift in the more difficult offshore areas is predominantly a capital and operating cost predominantly a capital and operating cost optimisation problem, comprehensive treatment of the best approach hinges very substantially on well production forecast assessments. These flow production forecast assessments. These flow performance predictions and the target design features performance predictions and the target design features that arise from them are all too often necessarily carried out with extremely limited productivity data relative to the producer's financial productivity data relative to the producer's financial exposure prospects. Thus the flexibility, reliability and resulting confidence in the system selected depends on a very practical assessment of the well performance sensitivity analyses specified to yield reasonable design targets.Downhole equipment should be simplified wherever possible in the interest of suppressing the impact of very high offshore well servicing costs. In this context, single point injection gas lift can frequently be recommended where high kick-off pressures are preferred to lower pressure, multiple unloading valve string systems. Submersible electric pumping may one day be a dominant favorite choice for high volume offshore artificial lift systems but it currently falls behind in many application circumstances in terms of its ability to reliably accommodate high angle wellbores, solids in the produced fluids, and segregated multiple completions among other operational limitations. An operations research breakthrough simply in the areas of mudline and sub-seabed pack-offs along with reliable electric power cable junction splicing could in themselves power cable junction splicing could in themselves provide a basis for substantially broader provide a basis for substantially broader applications of submersible electric pumps to high volume oil production in the marine environment.P. 277 Keywords: gas injection, artificial lift alternative, high capacity artificial lift alternative, reliability, Completion Installation and Operations, safety valve, Lift Alternative, configuration, artificial lift system, Upstream Oil & Gas Subjects: Artificial Lift Systems, Gas lift, Completion Installation and Operations This content is only available via PDF. 1978. Society of Petroleum Engineers You can access this article if you purchase or spend a download." @default.
- W4230709743 created "2022-05-11" @default.
- W4230709743 creator A5009988398 @default.
- W4230709743 creator A5039617166 @default.
- W4230709743 date "1978-10-01" @default.
- W4230709743 modified "2023-09-23" @default.
- W4230709743 title "HIGH CAPACITY ARTIFICIAL LIFT ALTERNATIVES IN THE OFFSHORE ENVIRONMENT " @default.
- W4230709743 doi "https://doi.org/10.2523/8070-ms" @default.
- W4230709743 hasPublicationYear "1978" @default.
- W4230709743 type Work @default.
- W4230709743 citedByCount "0" @default.
- W4230709743 crossrefType "proceedings-article" @default.
- W4230709743 hasAuthorship W4230709743A5009988398 @default.
- W4230709743 hasAuthorship W4230709743A5039617166 @default.
- W4230709743 hasConcept C124101348 @default.
- W4230709743 hasConcept C127413603 @default.
- W4230709743 hasConcept C139002025 @default.
- W4230709743 hasConcept C144024400 @default.
- W4230709743 hasConcept C149923435 @default.
- W4230709743 hasConcept C161191863 @default.
- W4230709743 hasConcept C2778805511 @default.
- W4230709743 hasConcept C2908647359 @default.
- W4230709743 hasConcept C41008148 @default.
- W4230709743 hasConcept C42475967 @default.
- W4230709743 hasConcept C67205732 @default.
- W4230709743 hasConceptScore W4230709743C124101348 @default.
- W4230709743 hasConceptScore W4230709743C127413603 @default.
- W4230709743 hasConceptScore W4230709743C139002025 @default.
- W4230709743 hasConceptScore W4230709743C144024400 @default.
- W4230709743 hasConceptScore W4230709743C149923435 @default.
- W4230709743 hasConceptScore W4230709743C161191863 @default.
- W4230709743 hasConceptScore W4230709743C2778805511 @default.
- W4230709743 hasConceptScore W4230709743C2908647359 @default.
- W4230709743 hasConceptScore W4230709743C41008148 @default.
- W4230709743 hasConceptScore W4230709743C42475967 @default.
- W4230709743 hasConceptScore W4230709743C67205732 @default.
- W4230709743 hasLocation W42307097431 @default.
- W4230709743 hasOpenAccess W4230709743 @default.
- W4230709743 hasPrimaryLocation W42307097431 @default.
- W4230709743 hasRelatedWork W2013233278 @default.
- W4230709743 hasRelatedWork W2352727848 @default.
- W4230709743 hasRelatedWork W2352946454 @default.
- W4230709743 hasRelatedWork W2352994152 @default.
- W4230709743 hasRelatedWork W2354742471 @default.
- W4230709743 hasRelatedWork W2354862989 @default.
- W4230709743 hasRelatedWork W2357984199 @default.
- W4230709743 hasRelatedWork W2388790916 @default.
- W4230709743 hasRelatedWork W2899084033 @default.
- W4230709743 hasRelatedWork W4231226515 @default.
- W4230709743 isParatext "false" @default.
- W4230709743 isRetracted "false" @default.
- W4230709743 workType "article" @default.