Matches in SemOpenAlex for { <https://semopenalex.org/work/W4256115807> ?p ?o ?g. }
Showing items 1 to 60 of
60
with 100 items per page.
- W4256115807 abstract "Test Installation Of Subsea Production System And Flowlines In Deep Water T. Madsen; T. Madsen Norsk Hydro A/S Search for other works by this author on: This Site Google Scholar S. Andersen; S. Andersen Det Norske Veritas Search for other works by this author on: This Site Google Scholar L. Vetaas L. Vetaas Det Norske Veritas Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Offshore Europe, Aberdeen, United Kingdom, September 1983. Paper Number: SPE-11912-MS https://doi.org/10.2118/11912-MS Published: September 06 1983 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Madsen, T., Andersen, S., and L. Vetaas. Test Installation Of Subsea Production System And Flowlines In Deep Water. Paper presented at the SPE Offshore Europe, Aberdeen, United Kingdom, September 1983. doi: https://doi.org/10.2118/11912-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Offshore Europe Conference and Exhibition Search Advanced Search PREFACE PREFACEThe subject for discussion in this paper is the marine operations as they were performed during the research project:CIB - DRVERLESS INSTALLATION AND MAINTENANCE OF SUBSEA PRODUCTION SYSTEMS IN DEEP WATERThe project commenced in January, 1981, with participation of six oil companies: AGIP, Chevron, Fina, Hispanoil, Norsk Hydro, and Total.AbstractA single-well Subsea Production System (SPS) was installed in 300m of water depth for test purposes in the Onarheimsfjord on the west coast of Norway in the autumn of 1982. Two different ways of connecting flowlines to the SPS were tested; a remote off-bottom pull-in operation featuring the J-method.All operations were performed diverless, a remotely operated observation vehicle (ROV) and an Atmospheric Diving Suit (ADS) being used for general assistsance and back-up.In order to optimise the operations, extensive analyses had been performed an the equipment and on the operational plan. These analyses included a failure mode and effect analysis (FMEA) on equipment and operations in general as well as computer simulations of the flowline operations.The objective of the test was to gain experience related to operations in deep water, state limitations in today's level of technology.The paper gives a review of the test and planning phase. The problems related to deep waters are pin-pointed, and some results are given.IntroductionOne of the critical phases in subsea field development is connected to marine operations during installation and completion phases. There are high costs involved, and at the same time a strict demand for safe and reliable operation. Subsea Production Systems have so far been installed in water depths where the use of divers has been possible either as a basic feature in the plans or as a means of back-up. Some diveless Subsea Production Systems have been installed in shallow water in order to prepare Production Systems have been installed in shallow water in order to prepare for future requirements. Keywords: retrieval, upstream oil & gas, subsea system, project management, lubricator cap, test installation, intervention, deep water, means, operation Subjects: Offshore Facilities and Subsea Systems, Strategic Planning and Management, Subsea production equipment, Project management This content is only available via PDF. 1983. Society of Petroleum Engineers You can access this article if you purchase or spend a download." @default.
- W4256115807 created "2022-05-12" @default.
- W4256115807 creator A5008220589 @default.
- W4256115807 creator A5016681226 @default.
- W4256115807 creator A5020273825 @default.
- W4256115807 date "1983-09-01" @default.
- W4256115807 modified "2023-09-25" @default.
- W4256115807 title "TEST INSTALLATION OF SUBSEA PRODUCTION SYSTEM AND FLOWLINES IN DEEP WATER " @default.
- W4256115807 doi "https://doi.org/10.2523/11912-ms" @default.
- W4256115807 hasPublicationYear "1983" @default.
- W4256115807 type Work @default.
- W4256115807 citedByCount "0" @default.
- W4256115807 crossrefType "proceedings-article" @default.
- W4256115807 hasAuthorship W4256115807A5008220589 @default.
- W4256115807 hasAuthorship W4256115807A5016681226 @default.
- W4256115807 hasAuthorship W4256115807A5020273825 @default.
- W4256115807 hasConcept C111368507 @default.
- W4256115807 hasConcept C127313418 @default.
- W4256115807 hasConcept C127413603 @default.
- W4256115807 hasConcept C151730666 @default.
- W4256115807 hasConcept C161191863 @default.
- W4256115807 hasConcept C162284963 @default.
- W4256115807 hasConcept C166957645 @default.
- W4256115807 hasConcept C199104240 @default.
- W4256115807 hasConcept C2777267654 @default.
- W4256115807 hasConcept C2777737062 @default.
- W4256115807 hasConcept C2778805511 @default.
- W4256115807 hasConcept C37531588 @default.
- W4256115807 hasConcept C41008148 @default.
- W4256115807 hasConcept C95457728 @default.
- W4256115807 hasConceptScore W4256115807C111368507 @default.
- W4256115807 hasConceptScore W4256115807C127313418 @default.
- W4256115807 hasConceptScore W4256115807C127413603 @default.
- W4256115807 hasConceptScore W4256115807C151730666 @default.
- W4256115807 hasConceptScore W4256115807C161191863 @default.
- W4256115807 hasConceptScore W4256115807C162284963 @default.
- W4256115807 hasConceptScore W4256115807C166957645 @default.
- W4256115807 hasConceptScore W4256115807C199104240 @default.
- W4256115807 hasConceptScore W4256115807C2777267654 @default.
- W4256115807 hasConceptScore W4256115807C2777737062 @default.
- W4256115807 hasConceptScore W4256115807C2778805511 @default.
- W4256115807 hasConceptScore W4256115807C37531588 @default.
- W4256115807 hasConceptScore W4256115807C41008148 @default.
- W4256115807 hasConceptScore W4256115807C95457728 @default.
- W4256115807 hasLocation W42561158071 @default.
- W4256115807 hasOpenAccess W4256115807 @default.
- W4256115807 hasPrimaryLocation W42561158071 @default.
- W4256115807 hasRelatedWork W1985554516 @default.
- W4256115807 hasRelatedWork W2369291762 @default.
- W4256115807 hasRelatedWork W2899084033 @default.
- W4256115807 hasRelatedWork W2463097368 @default.
- W4256115807 hasRelatedWork W2466348287 @default.
- W4256115807 hasRelatedWork W2478158691 @default.
- W4256115807 hasRelatedWork W2490023873 @default.
- W4256115807 hasRelatedWork W2499752175 @default.
- W4256115807 hasRelatedWork W2517021595 @default.
- W4256115807 hasRelatedWork W2522747692 @default.
- W4256115807 isParatext "false" @default.
- W4256115807 isRetracted "false" @default.
- W4256115807 workType "article" @default.