Matches in SemOpenAlex for { <https://semopenalex.org/work/W4256386301> ?p ?o ?g. }
Showing items 1 to 64 of
64
with 100 items per page.
- W4256386301 abstract "Pipeline Integrity Management System - A New Approach In Managing Pipelines Fairudul Azhar Abd Satar; Fairudul Azhar Abd Satar Petronas Carigali Sdn Bhd Search for other works by this author on: This Site Google Scholar Raja Zahirudin Raja Ismail; Raja Zahirudin Raja Ismail Petronas Carigali Sdn Bhd Search for other works by this author on: This Site Google Scholar Khairul Taufiq Saidin Khairul Taufiq Saidin PETRONAS Research & Scientific Services Sdn. Bhd. Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Asia Pacific Conference on Integrated Modelling for Asset Management, Kuala Lumpur, Malaysia, March 2004. Paper Number: SPE-87029-MS https://doi.org/10.2118/87029-MS Published: March 29 2004 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Abd Satar, Fairudul Azhar, Raja Ismail, Raja Zahirudin, and Khairul Taufiq Saidin. Pipeline Integrity Management System - A New Approach In Managing Pipelines. Paper presented at the SPE Asia Pacific Conference on Integrated Modelling for Asset Management, Kuala Lumpur, Malaysia, March 2004. doi: https://doi.org/10.2118/87029-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Asia Pacific Conference on Integrated Modelling for Asset Management Search Advanced Search AbstractManaging pipelines in operation divisions of PETRONAS Carigali Sdn Bhd (PCSB) always as important as producing a hydrocarbon from its fields. Three (3) PCSB domestic operation regions namely Peninsular Malaysia Operation (PMO), Sarawak Operation (SKO) and Sabah Operation (SBO) are currently operating a total of more than 277 pipelines. Due to aging pipelines that PCSB are currently operating in which some are more than 25 years, a prudent management in term of its risk and consequence as well as cost of operating the aging pipelines need to be re-assessed via a comprehensive management system that can be used as a tool to inform PCSB management in term its integrity.It is imperative that an integrated pipeline integrity management system (PIMS) to be made available to ensure pipelines integrity always available upon request and are up to date with the latest integrity status. Before the development of the PIMS for PCSB, all the pipeline integrity management for each region is residing with the individual(s)/units that performing specific functions e.g. inspection, engineering and operations. With the development of the PIMS, all those effort related to pipeline integrity are managed and integrated in more effective manner by single point reference i.e. Pipeline Competent Person in PCSB. It was determined that the adoption of an integrated approach in managing pipelines would be the optimal way to facilitate prudent management and surveillance of pipeline integrity.The purpose of this paper is to discuss the effort that had been put in making the PIMS project materialised as well as to share the experience in developing the system with the help of other resources from internal and external of PCSB organisation.Having the PIMS implemented in PCSB it will reduce considerable amount of time and effort that previously needed to acquire the integrity status of pipelines. Adopting an integrated team effort throughout the company has provided the necessary forum for open and inter-disciplinary exchange of ideas and experiences on PIMS related matters. As a result, it has aided in enhancing cooperative actions and the capturing of synergism, all to the benefit of the PCSB.IntroductionAs of January 2002, PCSB domestic operation is operating more than 277 pipelines, offshore and onshore with a combined length of more than 2000 km with each region has its own pipeline network. Fig 1 is a sample of network for Peninsular Malaysia Operations (PMO). Statically, the age of these pipelines are ranging from 1 year to 35 years with 32 pipelines or 12% of them are already exceeded their 20 years design life. Many more are approaching their design life.Most of the pipelines in SKO and SBO were taken over from previous operator i.e. Sarawak Shell Bhd (SSB) and Sabah Shell Petroleum Company (SSPC), whereas for PMO, half of the pipelines were taken over from previous operator, ExxonMobil Exploration And Production Malaysia Inc. (EMEPMI), previously known as ESSO Production And Exploration Malaysia (EPMI). Design and operating philosophy of each pipeline is different from operator to the other and this added to the complexity for pipeline operator to standardise with its corporate guideline.Due to that, some of PCSB pipeline operation guidelines requirement cannot be suited by those affected pipelines and thus giving some integrity issues with regards to PCSB pipeline operation philosophy. Coupled with different pipeline integrity management approaches by each region, this make the pipeline operation is more isolated to each region and thus sharing of best approach and streamlining of inspection and maintenance of pipelines1 become more difficult by PCSB Centre of Technical Excellence (CTE). CTE is a division where discipline experts reside for reference.Realising those hurdles in pipeline integrity management operation, a team comprising of CTE and PCSB Regional representatives, had proposed a new approach in managing pipeline integrity to PCSB management in May 2002. The proposal was approved to commence in Dec 2002.The main task of the project team was to develop a Pipeline Integrity Management System (PIMS) framework which later can assist pipeline engineer(s) in managing pipeline integrity in a better approach and which will be able to update PCSB management on pipeline integrity in timely manner. Keywords: spe 87029, pipeline pigging, database, upstream oil & gas, interface, pipeline corrosion, requirement, flowline corrosion, materials and corrosion, riser corrosion Subjects: Pipelines, Flowlines and Risers, Facilities Operations, Materials and corrosion, Pipeline pigging This content is only available via PDF. 2004. Society of Petroleum Engineers You can access this article if you purchase or spend a download." @default.
- W4256386301 created "2022-05-12" @default.
- W4256386301 creator A5023276798 @default.
- W4256386301 creator A5030247218 @default.
- W4256386301 creator A5055127201 @default.
- W4256386301 date "2004-03-01" @default.
- W4256386301 modified "2023-09-24" @default.
- W4256386301 title " Pipeline Integrity Management System - A New Approach In Managing Pipelines " @default.
- W4256386301 doi "https://doi.org/10.2523/87029-ms" @default.
- W4256386301 hasPublicationYear "2004" @default.
- W4256386301 type Work @default.
- W4256386301 citedByCount "0" @default.
- W4256386301 crossrefType "proceedings-article" @default.
- W4256386301 hasAuthorship W4256386301A5023276798 @default.
- W4256386301 hasAuthorship W4256386301A5030247218 @default.
- W4256386301 hasAuthorship W4256386301A5055127201 @default.
- W4256386301 hasConcept C127413603 @default.
- W4256386301 hasConcept C151730666 @default.
- W4256386301 hasConcept C161191863 @default.
- W4256386301 hasConcept C175309249 @default.
- W4256386301 hasConcept C199360897 @default.
- W4256386301 hasConcept C2777675914 @default.
- W4256386301 hasConcept C2778805511 @default.
- W4256386301 hasConcept C2779171504 @default.
- W4256386301 hasConcept C2779308522 @default.
- W4256386301 hasConcept C38652104 @default.
- W4256386301 hasConcept C41008148 @default.
- W4256386301 hasConcept C43521106 @default.
- W4256386301 hasConcept C76155785 @default.
- W4256386301 hasConcept C76178495 @default.
- W4256386301 hasConcept C86803240 @default.
- W4256386301 hasConcept C87717796 @default.
- W4256386301 hasConceptScore W4256386301C127413603 @default.
- W4256386301 hasConceptScore W4256386301C151730666 @default.
- W4256386301 hasConceptScore W4256386301C161191863 @default.
- W4256386301 hasConceptScore W4256386301C175309249 @default.
- W4256386301 hasConceptScore W4256386301C199360897 @default.
- W4256386301 hasConceptScore W4256386301C2777675914 @default.
- W4256386301 hasConceptScore W4256386301C2778805511 @default.
- W4256386301 hasConceptScore W4256386301C2779171504 @default.
- W4256386301 hasConceptScore W4256386301C2779308522 @default.
- W4256386301 hasConceptScore W4256386301C38652104 @default.
- W4256386301 hasConceptScore W4256386301C41008148 @default.
- W4256386301 hasConceptScore W4256386301C43521106 @default.
- W4256386301 hasConceptScore W4256386301C76155785 @default.
- W4256386301 hasConceptScore W4256386301C76178495 @default.
- W4256386301 hasConceptScore W4256386301C86803240 @default.
- W4256386301 hasConceptScore W4256386301C87717796 @default.
- W4256386301 hasLocation W42563863011 @default.
- W4256386301 hasOpenAccess W4256386301 @default.
- W4256386301 hasPrimaryLocation W42563863011 @default.
- W4256386301 hasRelatedWork W1998703085 @default.
- W4256386301 hasRelatedWork W2120762159 @default.
- W4256386301 hasRelatedWork W2328268473 @default.
- W4256386301 hasRelatedWork W2343140533 @default.
- W4256386301 hasRelatedWork W2351266154 @default.
- W4256386301 hasRelatedWork W2358029522 @default.
- W4256386301 hasRelatedWork W2359753894 @default.
- W4256386301 hasRelatedWork W2376850508 @default.
- W4256386301 hasRelatedWork W2420788298 @default.
- W4256386301 hasRelatedWork W2183907336 @default.
- W4256386301 isParatext "false" @default.
- W4256386301 isRetracted "false" @default.
- W4256386301 workType "article" @default.